FEC RAILROAD BRIDGE CLOSURE JANUARY 2018 1/18/2018

https://sadlerpoint.com/themes/user/site/default/asset/img/blog/IMG_2370-475x357.jpeg

EDIT 10:58 AM: The bridge is now operating as usual. Cold temperatures are suspected of causing hydraulic problems that are reportedly still being addressed.

As of about 4 AM on January 18th 2018, the FEC Railroad bridge at downtown Jacksonville is “stuck” in the down position according to a report from one of our customers and as confirmed by COJ Waterway Coordinator Jim Suber. We’ve been told that the cause of the problem is unknown and that resources are being deployed to solve it. We will update this page with more information once it’s available.