FEC BRIDGE CLOSURE IN EARLY APRIL 2016 3/29/2016

https://sadlerpoint.com/themes/user/site/default/asset/img/blog/IMG_3977_3-475x355.jpeg

From City of Jacksonville Dockmaster Jim Suber’s office:
FLORIDA – ST JOHNS RIVER – JACKSONVILLE – FEC RAILROAD BRIDGE: Bridge Closure.
Due to repairs, the FEC Railroad Bridge across the St Johns River in Jacksonville, FL will be closed from 7:00 a.m. to 11:00 a.m. and 1:00 p.m. to 5:00 p.m. on April 5 and 6, 2016.
Navigation will be limited to the small boat span during these hours.
Chart: 11491